October 24, 2016 – 81 FR 73153-73154 – NUCLEAR REGULATORY COMMISSION – United States Department of the Interior; United States Geological Survey TRIGA Research Reactor – The U.S. Nuclear Regulatory Commission (NRC) issued a renewal of Facility Operating License No. R-113, held by the United States Geological Survey (USGS or the licensee), for the continued operation of its USGS Training, Research, Isotope Production, General Atomics (TRIGA) research reactor (GSTR or the reactor) at a steady-state power level of 1.0 megawatt (MW) and a pulse power level as provided in the licensee’s Technical Specifications, for an additional 20 years. The GSTR facility is located on the property of the Denver Federal Center in Lakewood, Colorado.
October 24, 2016 – 81 FR 73148-73153 – NUCLEAR REGULATORY COMMISSION – Rhode Island Atomic Energy Commission; Rhode Island Nuclear Science Center Reactor – The U.S. Nuclear Regulatory Commission (NRC) is considering an application for the renewal of Facility Operating License No. R-95, which currently authorizes the Rhode Island Atomic Energy Commission (RIAEC or the licensee) to operate the Rhode Island Nuclear Science Center (RINSC) reactor at a maximum steady-state thermal power of 2 megawatts (MW). The RINSC reactor is a plate type fueled research reactor located at the University of Rhode Island Narragansett Bay Campus, in Narragansett, Rhode Island. If approved, the renewed license would authorize the licensee to operate the RINSC reactor up to a steady-state thermal power of 2 MW for an additional 20 years from the date of issuance of the renewed license. Because the license renewal application contains sensitive unclassified non-safeguards information (SUNSI), an order imposes procedures to obtain access to SUNSI for contention preparation.
October 24, 2016 – 81 FR 73144-73147 – NUCLEAR REGULATORY COMMISSION – In the Matter of Tetra Tech EC, Inc. – The U.S. Nuclear Regulatory Commission (NRC) is issuing a Confirmatory Order (CO) to Tetra Tech EC, Inc. (TtEC) to memorialize the agreements reached during an alternative dispute resolution mediation session held on September 7, 2016. This Order will resolve the issue that was identified during an NRC Investigation of TtEC employees at Hunters Point Naval Shipyard site in San Francisco, California. The Confirmatory Order is effective upon issuance.
October 24, 2016 – 81 FR 73154-73155 – NUCLEAR REGULATORY COMMISSION – Performance Review Boards for Senior Executive Service – The Nuclear Regulatory Commission (NRC) has announced appointments to the NRC Performance Review Board (PRB) responsible for making recommendations on performance appraisal ratings and performance awards for NRC Senior Executives and Senior Level System employees and appointments to the NRC PRB Panel responsible for making recommendations to the appointing and awarding authorities for NRC PRB members.